Search: Facilities Services, 2018
Results
Sustainability
In order to protect the health, wellness, and learning potential of all our students and staff, Â鶹¹ÙÍø is thinking deeply about how to both adapt to a rapidly changing climate, as well as mitigate our impact on it.
Sutter Middle School’s HVAC
Project Info:
Project Status:
Susan B. Anthony Elementary School’s Roof
Project Info:
Susan B. Anthony roof were done, as well as their gutters. (Funded By Bond Measure Q-Completed Summer of 2018)
Project Status:
Completed
Phoebe Hearst Elementary School’s Restroom Remodel
Project Info:
Phoebe Hearst Elementary got two staff restroom remodeled. They have new plumbing piping, toilets, sinks, mirrors, hand dryers, lights, epoxy flooring, paint, doors and signage. (Funded By Bond Measure Q-Completed Summer of 2018.)
Project Status:
Completed
The Met Sacramento High School’s Roof Remodel
Project Info:
The Met Sacramento High School’s roof was removed down to plywood, and replaced with a new roof system. (Funded By Bond Measure Q-Completed Summer of 2018)
Project Status:
O.W. Erlwine Elementary’s Curb Wall/Roof Remodel
Project Info:
The playground got a new seat wall built to enclose the play structure area, and provide additional seating for the kids while they are playing. (Funded By Bond Measure Q-Completed Summer of 2018)
The roof was removed down to plywood, and replaced with a new roof system. (Funded By Bond Measure Q-Completed Summer of 2018)
Project Status:
Completed
A.M. Winn K-8 School’s Asphalt
Project Info:
A.M. Winn’s asphalt was removed and replaced. (Funded By Bond Measure Q-Completed Summer of 2018)
Project Status:
Completed
Hiram Johnson High School’s New Field
Project Info:
Hiram Johnson playfield and track were replaced. Football, Soccer, and Track will be able to be played on the new field. (Funded By Bond Measure Q-Completed Summer of 2018)
Project Status:
Completed
Woodbine Elementary School’s Plumbing
Project Info:
Woodbine Elementary boy’s restroom was remodeled with a new layout. (Funded By Bond Measure Q-Completed Summer of 2018)
Project Status:
Completed